You can’t ask too much of a rock construction entrance. We installed this according to the state stormwater manual. This is the exit from a very small compost stockpile area. If the trucks could have stayed on the rock to be loaded out we wouldn't have had trackout. It's not much but it adds up and will cause non-compliant discharges when it rains. What have you used instead of rock entrances to prevent trackout?