|
Excellence Award |
Innovation, Education or Contribution to the ESC industry |
Sustained Contributor |
|
Winner |
Highly Commended |
Merit |
Winner |
Highly Commended |
Merit |
|
| 2024 |
Te Ara o Te Ata: A Legacy Project
Mount Messenger Alliance
|
Skyridge - A Beacon of Excellence in Urban Development Erosion and Sediment Control
Shadforth
|
On the (not so) straight and narrow highway; great outcomes in difficult conditions
O Mahurangi Penlink Alliance
|
Challies Island bridge
Taylors Contracting Co Ltd
|
Perched on the edge: An innovative approach to DEB design.
Mount Messenger Alliance
|
Ipswich City Council ESC Compliance Program
Ipswich City Council
|
Graeme Ridley and Quinn McIntyre |
| 2023 |
E2G PROJECT
HSA Group (John Holland, Seymour Whyte, AECOM), The Department of Transport and Main Roads (TMR), |
Mangamuka Slips and Rehabilitation CLL Solutions Limited
Takitimu North Link Project Heb Construction and Fulton Hogan Joint Venture |
|
NIWA Weather Forecasting – A New Zealand First in the Construction Industry HEB Construction |
|
|
Rob Loch & Michael Frankcombe |
| 2022 |
THE MARINE ESTATE MANAGEMENT STRATEGY PROJECT
North Coast Local Land Services
|
TURITEA WIND FARM
Downer NZ
|
|
Townsville City Council’s Reef Assist and Weeds to Healthy Soils Initiative, including the On-Country Soil Erosion and Sediment Control Training
Townsville City Council
|
Regional Erosion & Sediment, Education & Trial (RESET) Project
Sunshine Coast Council
|
|
Peter Armstrong |
| 2021 |
Innovating Sustainable Erosion and Sediment Controls
Fulton Hogan Seymour Whyte JV
|
Waimea Community Dam Project – The taming of the Lee River, Tasman District
Fulton Hogan Taylors JV
|
|
Innovation, Education and Collaboration
Fulton Hogan Seymour Whyte JV
|
|
|
|
| 2020 |
Ara Tūhono Puhoi to Warkworth – Creating better connections
Northern Express Group Contractors
|
Huntly Section of the Waikato Expressway
Fulton Hogan / HEB Joint Venture
|
|
EnviroMatrix Erosion Control Matrix (ECM)
Envirostraw Pty Ltd |
FODS (foreign object debris system) track out control matting.
JWA Oilfield Supplies
|
|
|
| 2019 |
The largest reinforced earth embankment in the Southern Hemisphere using the Maccaferri Green Terramesh Solution: Fulton Hogan Construction |
Bruce Highway Upgrade - Caloundra Road to Sunshine Motorway (CR2SM): Fulton Hogan Seymour Whyte Joint Venture |
|
Drawing a line in the sand: A practical approach to coastal erosion.: Soil Conservation Service |
Electronic dosing device (EDD).: RST Environmental Solutions |
|
|
| 2018 |
The Transmission Gully Motorway Project: CPB HEB Joint Venture |
NorthConnex: Lendlease Bouygues Construction Joint Venture |
|
|
|
|
|
| 2017 |
Bruce Highway - Cooray to Curra (Section C: Traveston to Woondum) Project: CPB Contractors, Department of Transport and Mainroads and GHD |
Coffs Harbour Slipway - Contaminated Lands Rehabilitation: Soil Conservation Service |
Aura: Shadforths Civil Contractors |
Vital Chemical and Vital Environment |
|
|
|
| 2016 |
Foxground and Berry Bypass: Fulton Hogan |
|
Eden View Drive - Road Construction Project - Gold Coast - Australia: City of Gold Coast |
Floc Box: Erosion Control Ltd |
|
Foxground and Berry Bypass: Fulton Hogan |
|
| 2015 |
Australia Pacific LNG Gas Gathering Project: Leighton Contractors |
|
|
Geo Spray |
|
EnviroStraw |
|
| 2014 |
North West Rail Link: Thiess John Holland Dragados |
Goolang Creek Rehabilitation Project: NSW Soil Conservation Service |
Mill Creek Wind Farm: Meridian Energy Limited & Bloxam Burnett & Olliver |
NSW Soil Conservation Service Urban Creek Unit |
Environment Canterbury's Builders Pocket Guide: Environment Canterbury |
Janine Koppel: Lake Macquarie City Council |
|
| 2013 |
Cotter Dam Project: Bulk Water Alliance |
Hunter Expressway: Hunter Expressway Alliance |
Queens Road Nudgee Subdivision: Hall Contracting Stages 5-7 |
Ecoblanket: Groundworks Australia |
|
|
|
| 2012 |
Banora Point Upgrade Alliance: Abi Group NSW Transport & Maritime Services Snowy Mountains Engineering Corporation |
Hobsonville Motorway: HEB Construction Ltd |
|
|
|
|
Bill Cumberland |
| Northlakes Business Park: Civil Contractors |
| 2011 |
|
|
|
|
|
|
|
| 2010 |
|
|
|
|
|
|
|
| 2009 |
Northern Gateway Toll Road Project: NZ Transport Agency Fulton Hogan Leighton Contractors URS |
Karuah to Bulahdelah Pacific Highway Upgrade: Abigroup Contractors Pty Ltd Roads & Traffic Authority NSW |
Coopernook to Herons Creek Pacific Highway Upgrade: NSW Roads and Traffic Authority Parsons Brinckerhoff Thiess |
Wilton Colleries Road Slip Remediation: Hiway Stabilizers Environmental Ltd |
|
|
|
| 2008 |
|
|
|
|
|
|
|
| 2007 |
Northern Busway and Esmonde Road Interchange Project. The Fletcher Construction Company Limited. |
|
Bonville Upgrade Pacific Highway Project. Abigroup Contractors Pty Ltd and RTA (NSW) |
|
|
|
|
| 2006 |
Clarence Valley & Coffs Harbour Regional Water Supply Project: EcoCivil Pty Ltd and SOILCON Pty Ltd |
|
Upper Harbour Bridge Duplication and Causeway Widening Project: Fletcher Construction Engineering |
|
|
|
|