Kevin Hood, Senior Project Manager, PBS Engineering and Environmental
Duration: 1 hour
Type of Course: Webinar - Live
The Washington State Department of Ecology (Ecology) administers Federal and state regulations requiring construction site operators to manage their stormwater and to obtain a Construction Stormwater General Permit (CSWGP) on sites one acre and larger. The permit requires the construction site operator, to designate a CESCL certified individual to conduct stormwater discharge monitoring and reporting. The purpose of these requirements is to reduce and prevent soil, dirt, and other common construction pollutants from washing off the site and reaching streams, rivers, and other local water bodies. In this presentation we will review the process for identifying appropriate construction site stormwater discharge monitoring points necessary to maintain compliance with requirements set forth in the SWPPP and CSWGP.
Learning Outcomes:
- Identification Stormwater Discharge Points
- Modification of Discharge Monitoring Points as construction progresses
- Discharge Point Field Identification and SWPPP Documentation Requirements
Hosted by:

