Unrolled Asphalt Berm Edge for Clean Water Diversion – Here is a cool trick for keeping clean water out of your project. The contractor put down asphalt but didn’t roll (compact) the edge, which left a 3 or 4 inch berm. Clean rain water was kept on the asphalt rather than flowing off into the dirt shoulder and disturbed areas.
Video: Dave Jenkins, CPESC